Nangwarry Water SA
Think Water Mt Gambier were commissioned in 2008 by Nangwarry Water to install irrigation for 2 X 55 Ha apple plantations at Nangwarry SA. Nangwarry is a small settlement located approximately 40 km's Nth of Mt Gambier SA.
Each 55 Ha site is irrigated separately from centrally located 25 megalitre Dams. The trees are drip irrigated using Netafim pressure regulated tube, filtration, control system and valves. As the area is susceptible to frost so there was a need to provide full
Wesfarmers Premier Coal WA
Wesfarmers Premier Coal Limited (Wesfarmers) has contracted Think Water Bunbury for works at their Collie coal mine.
Premier Mine is one of two coal mines located at Collie, some 70 km east of Bunbury and 200 km south of Perth. These mines supply coal to the coal fired power stations, also located at Collie, which are the main power supply for Western Australia.
Project Details:
Wesfarmers is developing Pit 3 and Pit 1 Deeps of the Premier Mine. All
Automatic Filter Station at Lindsay Point Almonds SA
The Filter system was designed by Andrew Sloan, Think Water - Riverland.
Project Specifications: Filter capacity designed to handle total of 670 litres per second, current capacity 500 l/sec. at a pressure of 1100 Kilopascals. (extra pump to be added later)
Project Cost: $300,000.00
Project Details: The filters selected were Plastro 250mm EBS filters complete with 130 micron suction scanning screen filtration.
Windy Hill Nursery NSW
Windy Hill Nursery at Mudgee, NSW has installed an innovative watering system, from Think Water - Mudgee that takes advantage of both rainfall and storm-water recycling. As with any nursery operation, water is a critical component- Windy Hill had a number of limitations that needed to be addressed to ensure adequate irrigation water was available for plant growth and for future expansion of the site. Bore water could not be used, due to |
Alpine Nursery Project NSW
Alpine Nursery, a large wholesale operation located in Sydney and Alstonville, engaged Think Water’s Alstonville branch to come up with a solution to their problem of transferring relatively large volumes of water from a spring fed dam into a lined 8 Megalitre irrigation storage dam.
![]() |
Project
Narrandera Sports Ground Project NSW
In November 2008, Think Water Leeton was commissioned to supply and install a rainwater harvesting and reuse system at the Narrandera Sports Ground.
![]() |
Project Details:
Stormwater catchment at the stadium: Stormwater network channels the roof water to an 8,100 litre
Potable Water Storage Tank at Willowra Community NT
Think Water Alice Springs was engaged by Power Water Corporation to supply and install a 456 Kilolitre Potable Water Store Tank at Willowra Community, 300Km North of Alice Springs and 130Km West of the Highway.
![]() |
Project Details:
Think Water Alice Springs removed two
Whitsunday Airport Project QLD
Think Water Whitsunday was recently appointed to a project at Whitsunday Airport where a system was to be put into place to treat black water to ‘A grade’ standards and distribute this through an irrigation system on to the runway area.

Project Details:
The airstrip at Whitsunday Airport has been lengthened to 1400 metres and
The Byron at Byron NSW
Project:
The Byron at Byron - An award winning, $45million resort at Byron Bay, owned by Gerry Harvey, that incorporates 92 air conditioned suites on 45 acres with tennis court, infinity pool, gym, poolside sauna and luxury day spa, and award winning restaurant and conference facilities.
Think
Think Water Mt Gambier were commissioned in 2008 by Nangwarry Water to install irrigation for 2 X 55... more...
Wesfarmers Premier Coal Limited (Wesfarmers) has contracted Think Water Bunbury for works at their... more...